Currency
Custom notifications:
Some Wulftec parts may have a lead-time, which will be determined by specific machine serial number. If a lead-time is associated with any of the part/parts needed a technician will be in contact by email to advise.Custom notifications:
Some Wulftec parts may have a lead-time, which will be determined by specific machine serial number. If a lead-time is associated with any of the part/parts needed a technician will be in contact by email to advise.Prices are subject to change based on factory.
SKU | M-8013-P |
---|---|
Short Description | Wulftec - Reed Switch Long Lead Smc - # 0MPNU00177 *Contact MPT for pricing and lead time.* |
Custom note | Some Wulftec parts may have a lead-time, which will be determined by specific machine serial number. If a lead-time is associated with any of the part/parts needed a technician will be in contact by email to advise. |
Machine Brand | Wulftec-M.J. Mallis |
Manufacturer's SKU | 0MPNU00177 |
Manufacturer's Model Number | 0MPNU00177 |
Manufacturer Category | Stretch Wrap Machine Parts |
Unit of Measure | each |